Friday, 4 December 2020

Port Toe Rail | Installation

While the second port rub rail laminate was curing, and while the epoxy was flowing, I installed the port toe rail.

It was a simple task. Here is the view from the front.


And here from the rear.


I haven't yet decided how much to trim off at the forward end of the toe rails, on the top of the Dorade boxes.

The manual says they should be 48" long, but mine are several inches longer than that.

I will see what they look like when I test fit the Dorade vents in the coming weeks.

No comments:

Post a Comment