Monday 12 October 2020

Seatback Tops | Getting Ready For Installation

 While the cabin roof was curing I prepared the seatbacks for installation in the same way that I had done in the cabin.

The only area in the seatbacks where squeezed out glue would be a problem is inside the lockers, so I taped the edges of the locker tops. This is the port locker top.


You can see that all the edges are protected by blue tape and plastic sheeting. The bottom of the locker is also covered with plastic dust sheeting to catch any drips.

The starboard locker received the same treatment, like this.


My plan is to reach inside the lockers when the tops are in place and scrape off the squeeze out before pulling the tape. We will see how effective that is in due course ...


No comments:

Post a Comment