Saturday 9 May 2020

Forward Deck | Prep For Installation

In readiness for fitting the forward deck I masked off the interior of the storage compartment and taped the sheerclamps and bulkheads to protect them from squeezed out epoxy.

This is what it looked like.



I then taped out the underside of the forward deck, for the same reason.



This should allow me to scrape off the squeeze out and remove the tape at the same time, leaving clean joints.

No comments:

Post a Comment