I made and fitted the cleats to the footwell sides some time previously, when I was making and fitting the deck support cleats to the hull and bulkheads.
Here are they are glued up and clamped, back in the late summer.
The cleats and the footwell sides and sole all received their three clear coats of resin and were finished ready for a test fit.
The sole needed a very slight trim with the block plane, but otherwise everything fitted nicely into place for the test fit, as here.
The footwell parts were then set aside ready for installation, which will now hopefully be quite soon!
No comments:
Post a Comment