I installed the lazarette hatches alongside the other hardware fittings.
I recalled that this was a bit of a drama the first time round, so I did a dry run using plain nuts instead of new Nylocks before committing to the final exercise.
This is the port hatch, test installed.
It was a lot easier then I expected.
Here are both hatches, dry fitted.
Happy that both hatches could be refitted without any trouble, I went ahead and sealed them in place with new Nyloc nuts.
This is the port hatch, with installation tools.
Having decent tools is the secret of success with this type of activity.
Finally, here are both hatches fully installed.
Now, what's next?
No comments:
Post a Comment